Daytime work will continue (7AM – 3PM, Monday–Friday)

  • Both northbound and southbound traffic lanes shifted to the right shoulder to create work areas for median barrier replacement between Exits 12b–15 (former Exits 16–19) and Exits 15-17(former Exits 19 and 21).
  • Another median work zone will be established northbound and southbound between Exit 18 on and off ramps (former Exit 22)
  • Median barrier and median drainage replacement are underway.
  • Ramp and shoulder drainage repair will continue throughout northbound and southbound from Exits 12B–18 (former Exits 15–22).

 

Night work will continue (6PM – 6AM, Sunday–Thursday)

  • Concrete pavement repair activities will resume Southbound from the Project limits at the North Main Street Bridge in Seymour to Exit 18 and Southbound from Exit 13-Exit 12b.
  • Traffic pattern will remain the same (both directions shifted to the right shoulder).
  • Median barrier and drainage work will continue.
Aerial view of a Route 8 with bridge
Previous Post
Update for the Weeks of August 10 & 17, 2026