Daytime work will continue (7AM – 3PM, Monday–Friday)
- Both northbound (NB) and southbound (SB) traffic lanes on Route 8 have shifted to the right shoulder to create work areas for median barrier replacement between Exits 12B–15 (former Exits 15–19), Exit 17 (former Exit 21), and between Exit 18 on- and off-ramps (former Exit 22).
- Median barrier and median drainage replacement are underway.
- Ramp and shoulder drainage repair will continue throughout NB and SB from Exits 12B–18 (former Exits 15–22).
Night work will continue (6PM – 6AM, Sunday–Thursday)
- Concrete pavement repair activities will resume on Route 8 SB from the project limits at the North Main Street Bridge in Seymour to Exit 18 and SB from Exit 13-Exit 12B.
- Traffic pattern will remain the same (both directions shifted to the right shoulder).
- Bridge joint repair has begun on Route 8 SB between Exit 18 off-ramp and its on-ramp.
- Median barrier and drainage work will continue.