All work will be paused over the Labor Day Holiday weekend from Friday 9/4 at 6AM until Tuesday 9/8 at 6AM
Daytime work will continue (7AM – 3PM, Monday–Friday)
- Both northbound and southbound traffic lanes shifted to the right shoulder to create work areas for median barrier replacement between Exits 12b–15 (former Exits 16–19), Exit 17(former Exit 21), and between Exit 18 on and off ramps (former Exit 22).
- Median barrier and median drainage replacement are underway.
- Ramp and shoulder drainage repair will continue throughout northbound and southbound from Exits 12B–18 (former Exits 15–22).
Night work will continue (6PM – 6AM, Sunday–Thursday)
- Concrete pavement repair activities will resume Southbound from the Project limits at the North Main Street Bridge in Seymour to Exit 18 and Southbound from Exit 13-Exit 12B.
- Traffic pattern will remain the same (both directions shifted to the right shoulder).
- Median barrier and drainage work will continue.